1Decision
Approve docs/superpowers/specs/2026-09-27-upstream-rebase-build-automation-design.md (automating the upstream-rebase cycle up to, but not including, signing) as the basis for a future implementation plan.
2Why and evidence
ADR-099 showed the manual rebase/build cycle works but is fully hand-run and found a real patch conflict only because a human was doing every step; the owner reviewed the spec directly and approved it as written, with signing explicitly staying manual per the spec's own scope.
3Consequences
No implementation plan exists yet — writing one is the next step, not yet started. Nothing in the automation the spec describes changes how signing works today (network-isolated the signing host, vault key, owner-typed credentials).
4Review when
An implementation plan is written and needs its own review, or the spec's assumptions about which stages can be automated turn out wrong once building starts.
Read from docs/governance/decision-log.md, entry ADR-104.