ObliviOS Developer portal Project site

Home / Decisions / ADR-104

Approve docs/superpowers/specs/2026-09-27-upstream-rebase-build-automation-design.md.

Accepted, recorded 27 September 2026.

Decision
ADR-104
Date
2026-09-27
Status
AcceptedAccepted
Mentions
ADR-099
Mentioned by
ADR-105

1Decision

Approve docs/superpowers/specs/2026-09-27-upstream-rebase-build-automation-design.md (automating the upstream-rebase cycle up to, but not including, signing) as the basis for a future implementation plan.

2Why and evidence

ADR-099 showed the manual rebase/build cycle works but is fully hand-run and found a real patch conflict only because a human was doing every step; the owner reviewed the spec directly and approved it as written, with signing explicitly staying manual per the spec's own scope.

3Consequences

No implementation plan exists yet — writing one is the next step, not yet started. Nothing in the automation the spec describes changes how signing works today (network-isolated the signing host, vault key, owner-typed credentials).

4Review when

An implementation plan is written and needs its own review, or the spec's assumptions about which stages can be automated turn out wrong once building starts.

Read from docs/governance/decision-log.md, entry ADR-104.